jessecornwell7 jessecornwell7
  • 02-04-2020
  • Computers and Technology
contestada

What element of a timeline helps to mark progress of the project?
O A. milestones
O B. job responsibilities
O C. external deliverables
OD. internal tasks

Respuesta :

Kekebad578
Kekebad578 Kekebad578
  • 02-04-2020
The answer is A.milestones
Answer Link

Otras preguntas

Fighting in Vietnam started in 1954 when which European nation tried to reassert their colonial claims to Indochina? A.) France B.) Great Britain C.) The Nether
What happens when atoms share electrons?
PLEASE HELP!!. Coral snakes are brightly colored highly venomous snakes with red, yellow, and black bands along their bodies. Another species of snake, called t
Which theory of matter states that all particles of matter are in constant motion?
Which, if any, of these mirrors can produce a real image?
A Caldera a _____? A.Type of volcano B.type of volcanic eruption c.very large volcanic bomb d.large depression in a volcano
what do closely spaced contour lines on a topographic map representA)a flat areaB)a steep slopeC)a riverD)an urban area
0.25 r – 0.125 + 0.5 r = 0.5 + r . Solve for r.
To determine the amplitude of a wave, you would need to know the . A) distance from the crest to the trough. B) maximum displacement of the wave from the equili
To find 36+29+14, Joshua rewrote the expression as 36+14+29. What property did Joshua use to rewrite the expression?