medm0om5iebernan medm0om5iebernan
  • 01-11-2016
  • Mathematics
contestada

A construction company delivered 40 loads of concrete in 5 days.

What was their rate of work?



A.




B.




C.




D.


Respuesta :

melhunt99
melhunt99 melhunt99
  • 05-11-2016
Well 40 divided by 5 is 8 and you don't have options so I would say 8 loads a day :)
Answer Link

Otras preguntas

The plot of your should develop from your A. Setting B. Characters C. Tittle
Which set of numbers could represent the lengths of the sides of a right triangle? 10, 15, 20 6, 9, 11 9, 12, 16 7, 24, 25
Condense: Ln 40 + 2 ln 1/2 + ln x
1. El pescado o el pollo
(3p + 1) + 6(p - 8) - 3(p + 2)
Find the side length of the square 16x2 +56x +49
How do I add ³3 to anything
"What is the scale factor of the following if YZG is dilated to RBP?"​
if a force if 105-n is applied to a mass of 57-kg what would be the resulting acceleration
A claim is an assertion about a topic true or false?