jennyyessaian jennyyessaian
  • 03-09-2019
  • Mathematics
contestada

A construction worker is blacktopping a driveway. He blacktops 35 1/2 square. Xyd2/hr yards in 5/6 hour. How many square yards can he blacktop per hour.

Respuesta :

sqdancefan
sqdancefan sqdancefan
  • 03-09-2019

Answer:

  42 3/5 yd²/h

Step-by-step explanation:

Divide the area by the time to find the unit rate:

  (35 1/2 yd²)/(5/6 h) = (71/2)(6/5) yd²/h

  = 213/5 yd²/h = 42.6 yd²/h

Answer Link

Otras preguntas

Find the product of ( x + 4) (x^2 + 3x + 2). QUICK
Calculate the new perimeter using a scale factor of 1/4
Read the situations below and determine which relationship is not functional Situation 1: a cell phone bill to the amount of minutes used Situation 2: the perim
Help me brooo please
What is the fraction in simplest form? 14/16 79 28/32 78 7/16
compound 1 contains 15.0g of hydrogen and 120.0g oxygen. What is the percent compound of each element?
List the steps of the scientific method Easy points, just don't be annoying.
how much work does a man perform on a lawnmower if he applies 25 N of force to push it 100 meters
PLZZZZZZZZZZZZZZZZZZZZZZZZZZZZZZZZZZZ help
What is an ionic bond? an attractive bond between two similarly charged atoms an attractive bond between two oppositely charged atoms a bond due to shared valen