​Finishing the construction of a home two days after the contract called for completion (no injury occurs) most likely will be considered

Respuesta :

andriansp andriansp
  • 08-06-2016
Finishing the construction for a longer period than the date that already agreed upon would be most likely considered : Breach of Contracts.
Which mean that the constructor basically fail to met his end of the contract agreement, causing the other party has the right to walk out from their contract
Answer Link

Otras preguntas

Find the surface area of the prism
NEED HELP PLEASE AND THANKS!
Living things respond to _____ changes in their environment to survive
In “Excerpt from Gadgets: Built To Not Last,” what does the phrase “throwaway culture” in paragraph 3 suggest about our society? Use **two** details from the ex
Jenny invests $2,000 at an interest rate of 5%. The amount of money, ma, in Jenny's account after t years can be represented using the equation m,- 2000(1.05)'.
14) If the investor wants to have a portfolio with a 16% expected return, the minimum standard deviation he can achieve is a) 40% b) 80% c) 20% d) 53.33%
NEED HELP ASAP!!! Read the passage. (1) Many American men were drafted during World War II. (2) Many other men volunteered to serve. (3) In fact, so many men e
What is the benefit of using biased representation for the exponent portion of a floating point number?.
Why were three methods of voting on a Bill created?
In food service the number on a portion scoop correspond to the number of servings in a number 10 can a liter a gallon or a quart?