bluebutterfly2877
bluebutterfly2877 bluebutterfly2877
  • 01-11-2020
  • Mathematics
contestada

240 examiners can complete the
correction work in 8 days. If the work has
to be completed in 6 days, how many
more examiners should be employed?​

Respuesta :

balkrishnapradhan947
balkrishnapradhan947 balkrishnapradhan947
  • 01-11-2020

40 more examiners.....

Answer Link
juraijsaeed
juraijsaeed juraijsaeed
  • 01-11-2020

Answer:

240 x 8 = 1920

1920 / 6 = 340

340 examiners can complete work in 6 days

Answer Link

Otras preguntas

How did martin luther king jr contribute to the civil rights movement?
What is the surgical procedure indicated in the term lithotripsy?
Trey has a right below the knee amputation. he reaches to scratch his right foot which is no longer there. trey is experiencing:
Why are shocks worse when you touch conductors rather than insulators?
is it possible to build a triangle using the given side lengths? if so, list the angles of the triangle in order from least to greatest measure. PQ=sqrt (58), Q
What force is needed to accelerate a child on a sled (total mass = 65.0 kg ) at 1.25 m/s2?
Use the following passage to answer the question. (1) Water is something most of us take for granted. (2) If we need a cold drink or want to take a shower, wate
CAN SOMEONE PLEASE HELP ME!!! I have been stuck on this for 2 days "All this is related by Americo, who adds that they returned to Spain and arrived at Cadiz wi
Is typically not referred to as a buffer type in critical chain project management?
Jill wants to find the quotient. Use multiplication and the distributive property to help Jill from JD the quotient. 144/8 = Multiplication: Distributive proper