sr9376328
sr9376328 sr9376328
  • 02-12-2020
  • Mathematics
contestada

men can do a work in 32 days in how many days will 24 men complete the same work​

Respuesta :

Аноним Аноним
  • 02-12-2020

Answer:

It will take 32/24, or 1 1/3 days, for 24 men to get the job done.

Step-by-step explanation:

Answer Link

Otras preguntas

Camp area utilization Mr Santos a logic expert is tasked with setting up the camp the main Medical Faculty area is 21 ft by 15 ft if the medical equipment and s
Describe some of the experiments using evidence from the text about tests done with HeLa cells in human patients. Why were these studies considered to be ethica
What is the charge on an electrically neutral atom of hydrogen?. . A. 1. B. 0. C. +1. D. +2.
Stephen, a network administrator, is assigned the task of securing a wireless SOHO network. He has enabled Wi-Fi encryption. What additional security measures c
Least to greatest with 2/3,1/2,1/4
What number should be added to each of the numbers 55, 100, 65, and 116, so that the resulting numbers are in continued proportion?
Uniform spacing patterns in plants, such as the creosote bush, are most often associated with what type of intraspecific interaction? a) Competition b) Mutuali
James lives 7/10 of a mile from school. Billy lives 4/10 of a mile from school. Who lives closer?
Christine drove 754 miles in 13 hours. At the same rate, how many miles would she drive in 7 hours?
What must be subtracted from 1. 5(2x − 5) to create an expression that is equivalent to 2. 5(3x + 8)?