how do you find the mean completion time of a PERT network diagram?​

Respuesta :

okekesarah01642112
okekesarah01642112 okekesarah01642112
  • 02-01-2021

Answer:

PERT is an estimating technique that uses a weighted average of three numbers (see below) to come up with a final estimate. The resulting PERT estimate is calculated as (O + 4M + P)/6. This is called a "weighted average" since the most likely estimate is weighted four times as much as the other two values.

Answer Link

Otras preguntas

A fan cart with the fan set to high rolled across the floor. The cart's speeds with the fan on high are shown below. If the fan were set to medium instead, what
A factory manufactures pipes that should have an ideal length, represented by 0 on the number line. The quality manager at the factory measures two random pipes
Which of the following types oh questions could be answered with some kind of distribution map
The percentage change in the price level from one time period to the next
what is the average of 1.99 2.99 3.99 3.89
A) Andy and Bob___(like) to dance. B) Liz___ (wait) for Jeff now. C) Gina___(have) a cellular phone. D) Jan and Marilyn____(go) shopping tomorrow morning. E) I
How do I graph 3 - 7i​
Use the clues to find the code number: It is between 8,500 and 8,800. When multiplied by 8, the result is a whole number. The digit in the hundreds place is ¾ t
the diameter of a circle is 12 inches. What is the area of the circle. Use 3.14 for the radius​
Water is a major agent of chemical weathering because water