stephaniecheng stephaniecheng
  • 03-03-2021
  • Engineering
contestada

Please help ASAP!!

Which type of control system requires engineers to analyze data before any corrective action occurs?

In contrast to automated control systems, a_________
is a type of control system in which engineers must first analyze a system's output and then decide if the system requires any adjustments.

Respuesta :

natashabrown16
natashabrown16 natashabrown16
  • 03-03-2021
I believe a Closed loop
Answer Link

Otras preguntas

find a common solution for each system of equations: y=3x+5 y=-5x-3
Where did the Greeks believe that most gods lived
Multiply these fractions (Lowest Terms) a) 2 x 3/4 b) 3 x 3/5 c) 4 x 1/3 d) 6 x 2/5 e) 1/2 x 1/4 f) 4/5 x 2/3 g) 5/6 x 3/4 h ) 1/10 x 2/3 i) 2 1/5 x 1/
graph y=3sinx and y=sin 3x on the same axes. label the graph of each function.
Where did the Greeks believe that most gods lived
How many hours are 180 minutes
Perimeter of a square with an area of 81cm2
Describe a pattern in the sequence of numbers. Predict the next number. 1) 1, 2, 6, 24, ___ 2) 0, 3, 8, 15, 24, ___
select the product of (3x-4)(3x4)
india takes the two hour train ride from minneapolis to chicago every dummer to visit her grandparents. The train traveled 44 7/16 (thats a mixed number) mile