15 workers working 8hrs a day can complete a piece of work in 20 days. In how many days will 10 workers do it,working 6 hrs a day? please help!!

Respuesta :

ridmitharuka
ridmitharuka ridmitharuka
  • 02-08-2021

Answer:

40 days

Step-by-step explanation:

w1*h1*d1=w2*h2*d

15*8*20=10*6*d

2400=60d

d=2400/60

d=40

Answer Link

Otras preguntas

What is the value of the expression 3y−zy+5z when y = 6 and z = 2?
What is the value of 100 C on the Kelvin scale
Which of the following is not a symbol for an element? A) N B) Na C) Ca D) NO
What is the probability that their first child will also be homozygous dominant for curly hair? a. 25% b. 75% c. 50% d. 0%?
A sample of 0.0200 mol of chlorine gas is kept at 27.0°c and 0.150 atm. what would be its pressure if the temperature was increased to 227.°c and the volume kep
If the lift was greater than the weight of the plane the plane would
What is the theme of “excerpt from Tamar “
A 24 kg child descends a 5.0 m high slide and reaches the ground with a speed of 2.8 m/s. What is the mass of the child?
How old would you be in 3005 if you were born in 1996?
Is (p∨q)∨(q→p) a tautology, contradiction, or neither?