15men can complete a piece of work in25days. how many men should be added to complete the same work in15days.​

Respuesta :

mhanifa
mhanifa mhanifa
  • 04-08-2021

Answer:

  • 10 men

Step-by-step explanation:

Amount of work done by 15 men is:

  • 15 men *25 day = 15*25 man*days

Same work can be done by 25 men, in 15 days, so 10 more men should be added.

Answer Link
abovejosh
abovejosh abovejosh
  • 04-08-2021
Answer: 10 men explanation: guy above me
Answer Link

Otras preguntas

What is the volume of the sphere? Round the answer to the nearest cubic unit. Diameter: 22 cm 1) 507 cm^3 2) 1,394 cm^3 3) 5,575 cm^3 4) 16,725 cm^3
A t-shirt manufacturer designs shirts showing caricatures of certain generic “rich” athletes. these are not literal depictions but rather exaggerated images of
The production of acid rain from the release of sulfur dioxide (so2) and nitrogen oxides (nox) into the atomosphere is generally associated with the burning of
If we know what type of rock we are examining, we can figure out how much it weighs how hard it is how it was formed where it was formed
In this assignment we will work on the creation of a poker game. at a minimum your game must deal 2 hands of cards, and print out what poker hand each has. it m
Embezzlement is distinguished from fraud on the basis of:
The hellenistic culture associated with the rule of Alexander the great develop as a result of
Why is a squid considered a cephalopod
Which is the correctly balanced chemical equation for the reaction of KOH and H2SO4?
Who can help me with that one please ? Thanks!