elizabethmorladza
elizabethmorladza elizabethmorladza
  • 01-09-2021
  • Mathematics
contestada

A piece of work takes 20 labourers to complete in 10 days. how many labourers will complete the same job in 25 days if they work at the same rate?​

Respuesta :

denimjackets23
denimjackets23 denimjackets23
  • 04-09-2021

Step-by-step explanation:

If 20 labourers=10 days

x labourers = 25 days

10x= 25×20

[tex] \frac{10x}{10} = \frac{25 \times 20}{10}[/tex]

Cancelling out by 10 on both sides

[tex]x = \frac{25 \times 2}{1} \\ x = 50 [/tex]

Therefore, it takes 50 labourers to complete the work at the same rate in 25 days.

Answer Link

Otras preguntas

to develop good alternatives, one should brainstorm ideas and consider different perspectives. true or false.
What are two major forces that shape and reshape earth? describe how each force works.
solve the equation for b: b^-3= 1/64
a single molecule of h2o hasa. none of the properties of h2o.b. all the properties of h2o.c. some of the properties of h2o.
solve the equations 1. 16x^2-1=0 2. 36z^2 96z 15=0
In what way does renewable energy differ from nonrenewable energy? it is cheaper to produce than nonrenewable energy it is never used in automobiles it is deriv
Which characteristic is given by the principal quantum number? a)orbital size b)orbital mass c)orbital shape d)orbital orientation
solve and type in 'ab' 8×a=32,a+26=b+1,a<20<b
describe two traits of a good scientist.
Recall that the slope of a non-vertical line is a measure of the number of units the line rises (or falls) vertically for each unit of horizontal change from le