hannahgrace31511 hannahgrace31511
  • 03-11-2021
  • Mathematics
contestada

A chef can finish a catering job in 4hr. His student can do the same job in 12hr. How long will it take them both to do the job if they work together

Respuesta :

shayy1616 shayy1616
  • 03-11-2021
12 divided by 4 equal 3
Ans:3hrs
Answer Link

Otras preguntas

True or false. in frogs, blood flows through the pulmocutaneous circuit between the heart and the lungs and skin and through the systemic circuit between the he
Samurai and knights: were the similarities greater than the differences?
How old was sherburne and what were his duties aboard the ship
What accounted for the tremendous rise in the profits of the american financial industry, from less than 10 percent of total business profits in the 1950s to mo
a home owner wants carpet two rooms that each measure 12ft by 15 ft. how many square yards of carpet should be ordered?
How do cheetah kittens silver manes help honey badger to survive
what is the total cost for 2 1/2 recipes if the evaporated milk is 1.30 per can the condensed milk is 1.80 and the tea bags are 8.00 for 100 tea bags
7. Find the slope of the line through ( -2,6 ) & (3,14).
Ella used 37.2 pounds of apples to make applesauce . She used one -tenth as a many pounds of sugar as pounds of apples . How many pounds of sugar did Ella use ?
What is the slope of a line that is parallel to y=5x+3