reginalove2307 reginalove2307
  • 02-02-2022
  • Medicine
contestada

$2.6 billion to develop a drug? new estimate makes questionable assumptions

Respuesta :

BablaKanchan
BablaKanchan BablaKanchan
  • 02-02-2022

Answer:

New Estimate Makes Questionable Assumptions. The Tufts Center for the Study of Drug Development has just released its newest estimate for the cost to develop and bring a drug to market. At $2.6 billion, this figure is bound to get a lot of attention. We should take this announcement with a grain of salt, however

Explanation:

Answer Link

Otras preguntas

what is the rate of change on the table above A) -1/3 B) 1/2 C) -1/4 D) 1/5
The area of a rectangle parking lot is 8712 m^2 if the width of the parking lot is 88m. What is its length
i need simple app ideas​
What is the image point of (-8,9)(−8,9) after a translation right 3 units and down 1 unit?
What is the 20th term in the sequence f(n)=19-6×n for n≥0? Please answer, I will give brainliest. Point snatchers will be reported.
the perimeter of a rectangular tray is 60in the length of the tray is double the width of a tray determine the dimensions of the rectangular tray​
Find the slope of the line. x= 4 Select the correct choice below and, if necessary, fill in the answer box to complete your choice. O A. The slope is m = (Type
How many independent variables should be tested at a time in a scientific investigation?
Driving defensively may be viewed as a hostile and aggressive act by other drivers. Please select the best answer from the choices provided Т F
Describe the motion shown in the lines