grahamashanti175
grahamashanti175 grahamashanti175
  • 02-05-2022
  • Mathematics
contestada

You normally pay your line cooks $22 per hour, but one has worked overtime and should be paid time and a half. What is
the correct overtime pay per hour?

Respuesta :

sqdancefan
sqdancefan sqdancefan
  • 03-05-2022

Answer:

  $33 per hour

Step-by-step explanation:

"Time and a half" means the overtime rate is 1 1/2 times the base rate.

  overtime rate = (1 1/2) × $22/hour = $(22 +1/2(22))/hour = $33/hour

The correct overtime rate is $33 per hour.

Answer Link

Otras preguntas

Why does Lara, a nursing assistant, allow her knees to meet the knees of her patient Hugh when moving him into a wheelchair? It allows the patient to aid the tr
The more than the product of two and a number x
I'm bore d.................anybody else?
Sheila, janice, and katen, working together at the same rate, can complete a job in 3 1/3 days. Working at the same rate, how much of the job could janice and c
which number is the decimal form of ? 03 0.36 2.7 0.375
970 grams decreased by 15.1 per min. How many grams are remaining after 14 minutes
brainly- How does littering affect humans?
hese stage directions from The Golem suggest.... A- a lively, natural setting B- boats and rafts in the water C- a wild, lonely place D- monkeys, birds and ins
Which information appears on a secondary label? O A. country of origin ОВ. care instructions O C. size specifications OD. designer's name
HELP HELP HELP HELP WILL GIVE BRAINLIST