A feature control frame must be connected to

Respuesta :

tcs1257621
tcs1257621 tcs1257621
  • 03-07-2022

Answer:

Surface Parallelism When a surface is to be parallel to a datum plane, the feature control frame is connected by a leader to the surface, or to an extension line from the surface.

Explanation:

Answer Link

Otras preguntas

Mi hija es estela estela, tiene una hija, quién es la hija de estela. Mi nieto Mi nieta Tu prima Tu primo I am not positive that this is a correct questi
3) PLS HELP!!! BRAINLIEST AND 10 + POINTS
either tomas or nicki ____ to arrive promptly at 6 a.m. to open the store. a. are needing b. will need c. needs d. need
A school administrator wants to know what proportion of the approximately 80,000 teachers in their state have a Master's degree. The administrator takes an SRS
Payton collected data to show the relationship between the number of hours he practices in the number of errors he makes when playing a new piece of music the t
Discuss the influence of the Vatican on the renaissance
Need help on this one
(help me pleaseeee) a triangular prism has base edges 4cm , 5cm , and 6cm long. it’s lateral area is 360cm2. what is the height of the prism ?
The process of forming two DNA molecules from one is called ________. translation replication expression transcription
I NEED HELP NOWWWWW. PLEEEASSSE ANSWER QUICKLY WITH CORRECT ANSWER. WILL BE AWARDED WITH BRAINLIEST ANSWER. 1. There is a flagpole in the school parking lot. W