In a project network, the critical path is the sequence of activities which has the:________.

Respuesta :

66hello60
66hello60 66hello60
  • 03-08-2022

Answer:

The correct answer is the longest time

Answer Link

Otras preguntas

Match the digestive accessory structure/organ/gland with the correct function. a. pancreas ___production of bile by. liver ___ tearing, cutting and grinding of
the equations of two functions are y equals -21x + 9 + y equals -24x + 8 which function is changing more quickly and why?
Use even and odd properties of the trigonometric functions to find the exact value of the expression. csc(−π/6)
Factor the expression 54x+81 using gfc
Fusion: A.requires high temperatures B.occurs in the sun and other stars C.creates less radioactive waste than fission D.all of the above
Three times the sum of a number and -2 is -15. find the number
Should schools cancel summer vacation? I got two reasons why schools shouldn't cancel it. 1. students can rest 2. can study more give me the third reason
Most of the earth's surface land is required to produce enough food for the population. True False
Fusion: A.requires high temperatures B.occurs in the sun and other stars C.creates less radioactive waste than fission D.all of the above
I need help with 43-45